We are moving three SEPM servers which replicate with each other to a new physical location. Server name will stay the same, stay in the same domain and just the ESX VM of the servers will physically move to a new host.
During the move the server will require a new IP for each of the three.
Clients are set to contact the SEPM using the default server generated list which includes in this order the IP, NetBIOS name, FQDN from the original install.
1. Will the servers auto update everything including the client IP in the default server list to communicate after the move? I understand the clients will fall back to the server names if the IP is not valid. I assume it will then update it s local settings to the new IP.
2. Do we need to stop replication before changing the IP? Currently set to use the server NetBIOS name to contact each other and not the IP.
3. Any other gotcha's like certificates and such?
Again ony the three SEPM IP's are changing.
Thanks in advance.